MAGNUS POWER P LTD , BANGALORE

PROJECT 1 X 53.9 MW,BANCO ENERGY GENERATION PVT LTD,MUNSHIGANJ PIPING WORK SCHEDULE INSIDE AND OUTSIDE PH BUILDING

FABRICATION WORK

MARCH

APRIL

1st WEEK

2nd WEEK

3rd WEEK

4th WEEK

1st WEEK

2nd WEEK

3rd WEEK

4th WEEK

PIPINGS INSIDE PH SHED

START DATE

END DATE

1

2

1

2

1

2

1

2

1

2

1

2

1

2

1

2

1

ENGINE COOLING WATER SYSTEM HT LINE

3/15/2017

4/5/2017

2

TURBOCHARGER LUBE OIL SYSTEM LINE

3/20/2017

4/10/2017

3

STARTING AIR DISTRIBUTION SYSTEM LINE

4/5/2017

4/25/2017

4

LUBE OIL TREATMENT SYSTEM LINE

3/15/2017

4/5/2017

5

LUBE OIL SUPPLY SYSTEM LINE

3/20/2017

4/10/2017

6

EFFLUENT SYSTEM LINE

4/5/2017

4/25/2017

7

NOZZLE COOLING WATER SYSTEM LINE

3/15/2017

4/5/2017

8

COOLING WATER SUPPLY - DEIOINISED

3/20/2017

4/10/2017

9

STARTING AIR GENERATION SYSTEM

4/5/2017

4/25/2017

10

PROCESS WATER SUPPLY - DEIONISED

3/15/2017

4/5/2017

11

PIPING LAYOUT FOR CONDENSATE SYSTEM INSIDE PH SHED

3/20/2017

4/10/2017

12

CHARGE AIR COOLING WATER SYSTEM

4/5/2017

4/25/2017

13

DIESEL OIL MAIN SYSTEM

4/10/2017

4/25/2017

PIPINGS OUTSIDE PH SHED

14

PIPING FOR HFO UNLOADING SYSTEM

3/20/2017

4/15/2017

15

PIPING FOR DIESEL UNLOADING SYSTEM

3/25/2017

4/20/2017

16

PIPING FOR LUBE OIL UNLOADING SYSTEN

3/30/2017

4/25/2017

17

PIPING FOR SLUDGE UNLOADING SYSTEM OUTSIDE POWER

3/20/2017

4/15/2017

18

PIPING FOR LUBE OIL SLUDGE OUTSIDE POWER HOUSE

3/25/2017

4/20/2017

19

PIPING FOR WATER SYSTEM OUTSIDE POWER HOUSE

3/30/2017

4/25/2017

20

PIPING FOR TANK FARM AND POWER HOUSE

3/20/2017

4/15/2017

21

PIPING ON PIPE BRIDGE

3/25/2017

4/20/2017

22

PIPING FOR RADIATOR PIPING (HT & LT ) OUTSIDE POWER HOUSE

3/30/2017

4/25/2017

23

PIPING FOR FEED WATER SYSTEM

3/20/2017

4/15/2017

24

PIPING FOR STEAM SYSTEM OUTSIDE POWER HOUSE

3/25/2017

4/20/2017

25

PIPING FOR STEAM SYSTEM INSSIDE POWER HOUSE

3/30/2017

4/25/2017

26

PIPING FOR CONDENSATE OUTSIDE POWER HOUSE

4/5/2017

4/25/2017